PART 9

Two weeks after the funeral, the first practical problem arrived.

The studio’s heating unit failed during a cold rainstorm, and the repair estimate was almost the equivalent of four months’ rent at my old bedroom.

Pete knew a contractor who gave us a fair quote, but the experience frightened me.

I could not keep a sophisticated studio running on wishful thinking and the savings Dad had collected from me.

I made a spreadsheet.