He checked the access panel.

Arthur had maintained it carefully.

The filter needed replacement according to the system’s requirements.

We discussed the price and timing.

The roof could be inspected separately before I committed to the older estimate.

I wrote everything down.

When the contractor left, I placed the new notes beside Arthur’s list.

A strange feeling came over me.